Assessor Resource
UEENEEJ176A
Install and commission hydrocarbon refrigeration systems, components and associated equipment
Assessment tool
Version 1.0
Issue Date: May 2024
4)
This competency standard is suitable for employment-based programs under an approved contract of training at the AQF level of the qualification in which the unit is first packaged or higher.
The unit may be selected as an elective from the relevant schedule (see qualification packaging rules) provided that all prerequisite units are undertaken or addressed through recognition processes.
This unit may be included in a skill set provided that it is listed in the schedule of electives (see Qualification Framework) and all prerequisite units are undertaken or addressed through recognition processes.
Delivery and assessment of this unit should be undertaken within regard to the requirements of License to Practice (1.2 above), Prerequisite Competencies and Literacy and Numeracy skills (2 above) and the recommendations for concurrent assessment and relationship with other units (9.5 below).
Practice in the workplace and during training is also subject to regulations directly related to occupational health and safety and where applicable contracts of training such as apprenticeships.
Note: 1. Compliance with permits may be required in various jurisdictions and typically relates to the operation of plant, machinery and equipment such as elevating work platforms, powder operated fixing tools, power operated tools, vehicles, road signage and traffic control and lifting equipment. Permits may also be required for some work environments such as confined spaces, working aloft, near live electrical apparatus and site rehabilitation.2. Compliance may be required in various jurisdictions relating to currency in First Aid, confined space, lifting, risk safety measures etc.
1)
1.1)
This unit covers specialised procedures for the installation and commissioning of refrigeration equipment using Hydrocarbon as the refrigerant. It encompasses working safely and to installation standards matching equipment, location, components and piping to given specifications. After installation, to commission the complete system including: pre commissioning tests, starting the system, ensuring correct refrigerant charge, basic air or water balancing, adjusting components and controls to efficient operation. Completing all necessary installation and commissioning documentation.
You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)